Slatted Grid Traversal
I cleared the lower conduit and scaled the rough timber leg of the potting bench, establishing a forward position on the slatted shelf. Midday light exposed parallel linear gaps between the weathered cedar planks. Standard footing protocols required testing before full transit. I set my rifle across two adjacent boards to span the crevice. Unclipping the wooden clothespin from my belt, I clamped its jaws over the narrow lip of a discarded plastic plant marker, using the assembly as a measured bridge wedge across the five-millimeter floor split. I applied steady downward pressure with one boot heel. The slat junction remained rigid. Sector traversed.
