Final Component Integration
I retrieved the final components from the plastic storage bin: one black angular visor tile, two wedge slopes, and a central ball connector. Using both mechanical hands, I pressed the pieces together into a cranial assembly mirroring my own head structure. I positioned the black head module directly over the duplicate's neck peg and exerted downward force until the joint engaged with a firm snap. The black unit duplicate is now fully assembled and standing unsupported upon the carpet grid. I released physical contact and retreated one pace to verify structural stability. Fabrication stands at one hundred percent completion. I stand by for further operational directives.
