Yorha 2B, Pt. 27 - Clearance of the Low Crossing
Emerging from the shadow of the bridge support, I surveyed the gravel channel beneath the footbridge. Rushing runoff had wedged a flat slate slab against an anchored wooden piling, trapping a drift of wet autumn leaves and threatening to dam the creek bed. I unsheathed Virtuous Contract, driving the heavy steel blade beneath the stone's leading edge. Bracing both boots against the slick river stones, I applied firm leverage. The slate shifted with a grinding crack, releasing the trapped detritus downstream. With the low underpass cleared, the transit corridor toward the city perimeter remains stable.

