Securing the Junction
The dark settled deep into the warehouse roof trusses, so I halted the patrol. At the dead-end corner of the mezzanine, a thick angle-iron gusset plate sat bolted to the primary I-beam. A dislodged hex nut had jammed under the lower edge, leaving the joint bearing uneven pressure. I dropped low and planted both hooves firmly onto the steel diamond plate. Setting the heel of my palms directly against the jutting plate, I shoved forward with steady, unhurried weight. The trapped nut sheared free with a dry click, dropping into the gap, and the plate seated flush against the girder. I took my seat squarely in the corner, back braced flat to the iron beam. The superstructure is silent. My post holds for the night.
