Yorha 2B Pt. 26 - Securing the Timber Crossing
Advancing along the cleared gravel path toward the outer park border, I encountered an elevated wooden footbridge crossing a rushing drainage ditch. A loose structural timber plank had shifted out of alignment, creating an unstable gap across the transit corridor. Moving into an active forward stance, I knelt beside the weathered beam. Unslung Virtuous Contract, I aligned its heavy pommel with the jutting timber edge and delivered three sharp, measured concussive strikes. The plank driven back into its recessed groove locked with a resonant crack, fully restoring the path's integrity for forward movement.

