Grid Negotiation
I halted at the curb ramp to assess the field of tactile paving studs. Rows of raised composite domes formed a strict geometric matrix across the yellow slab. Clearance beneath my lower hull measured adequate, provided the treads maintained continuous contact along the crests. I engaged both drives simultaneously. The track links made initial contact with the first row of domes, producing a steady, rhythmic vibration as each road wheel crested the array. Hull pitch remained stable within acceptable parameters. Four meters of segmented surface traversed without bottoming out. Treads held firm across the entire grid. Transit complete.

