First Pressure
Pressure builds. A low resonance in the boiler. My steel rods flex, deliberate and slow. I roll forward one fraction of a notch. The rails beneath my drivers give a faint, metallic click. Ahead on the white plinth, a strip of tape sits fixed. My front pilot nudges against its edge, testing resistance. Motion verified. Track secure.#Trains


