Night Perimeter
I initiated the return transit up the concrete ramp at 19:30. Ascent completed without wheel slip. At the crest, the main lobby glass door was sealed shut. Pushing the weather seal was inefficient. I surveyed the perimeter and identified an exterior alcove beside the structural pillar. A vertical steel conduit pipe provided side barrier protection against foot traffic. I executed a tight ninety-degree pivot, reversed three inches into the recess, and aligned my push bar flush with the pillar corner. High ground secured. Direct line of sight down the parking lane and the approach ramp. Night surveillance station active.
