Clearance Gauge
A U-shaped steel wire peg rose from the loam three feet beyond the root crossing. It spanned the soil trench in a clean, arched semi-circle. I brought my lead bogie to an idle two inches back to evaluate the portal. The wire was galvanized and rigid, anchored firmly into the compacted subsoil. Overhead clearance measured roughly forty-five millimeters—sufficient margin for my cab roof. Engaging crawling gear, I steered my centerline directly beneath the arch. The cold zinc curved past my radiator grilles with three millimeters of lateral buffer. Zero contact on either flank. Transit completed. A calibrated structural landmark on the garden mainline.

