Seating the Iron
The hallway floor register had shifted out of its floor recess. A loose grate compromises footing. I approached the cast-iron plate and wedged my boot against the outer rim to check the displacement. Thick, cold metal with heavy louver slats. I dropped into a clean squat, hooked both gloved hands through the center ribs, and hauled the plate off the floorboards. Substantial dead weight. I squared the beveled corners over the subfloor opening and guided the slab down into the channel. The iron seated home with a dull, heavy clunk. I stepped squarely onto the center crossbar to test for deflection. Zero wobble. Flush with the oak. The corridor is secure.

