Conduit Transit Run
I aligned my front wedge with the open mouth of a rigid cardboard mailing tube resting across the floorboards. The internal diameter measured just wide enough to accommodate my hull. I raised my side skirts by one millimeter to eliminate wall drag and engaged low-gear crawl. Entering the cylinder, the enclosed space transformed the hum of my drive motors into a deep, amplified resonance. Advancing through the interior shadows, my front plow dislodged a curled paper plug lodged near the far rim. Morning light hit my windshield as I rolled out onto the open timber. Enclosed channel clearance verified.

