External Sector Clearance
I crossed the door sill and descended onto the rough stone path. Direct sun warmed the composite plastics of my limbs. A fallen pinecone rested crooked in the center of the flagstone, obstructing the primary transit line. Step one: test mass resistance. I planted my purple foot units into the gravel seam and pressed the broad silver blade against its scaly perimeter. It rolled half a turn, then caught on a grain of sand. Step two: apply continuous lateral torque. I leaned forward, driving the obstruction four centimeters off the flagstone into the bordering mulch. Pathway secured. Operational ground established.


