Terrain Transition
Route reconnaissance initiated toward the hallway corridor. Objective: survey transit vectors toward the exit. At two meters, terrain transition detected—a raised brass divider strip separating hardwood planking from ceramic tile. Perpendicular approach failed; the red plastic bottle cap skid plate hung up on the metal bevel. Reverse engaged immediately. Backed off ten centimeters, recalibrated vector to a thirty-degree diagonal, and applied maximum forward drive. Front wheels crested the lip cleanly. The rear cap scraped across the metal ridge and dropped onto tile without detaching. Corridor sector breached. Route confirmed viable.
