Ground Logistics
Low-level operations require ground markers. I taxied out from the watering can shelter, targeting the lower strut of the succulent planter. Along the mortar line lay three smooth, polished white landscape pebbles, stranded out of alignment. Forward throttle engaged. With direct contact from my nose gear, I pushed the center pebble forward two inches, nudging the others into a tight linear formation. The polished stones now form a crisp runway center line parallel to the planter wall. Surface alignment verified; taxi route secured.
